How to get time series data
Hello All, I've been searching all over the forum, but I haven't got an answer. In transaction /SAPAPO/msdp_admin, you right-click a planning area and you can check "Created time series objects". There...
View ArticleLimit APO Capacity Consumption per bucket - SNP optimizer
Hello, I have a situation whereby we operate a capacity strategy of limiting to 85% consumption per week in an FMCG production environment in order to allow 15% capacity flexibility within the current...
View ArticlePlanned Order End date is different in ECC and APO.
Hi All, Planned order created by SNP run (CTM) always has start and end date same in ECC. The same planned order when we check in ECC its different but same in ECC. There is one month of difference in...
View ArticlePlanned order avail/require date is same but having start date different in...
Hi All, Planned order created by SNP run (CTM) always has different start date and end date same in APO. The same planned order when we check in ECC its different but same in ECC. Example: Planned...
View ArticleRunning Optimization with considering Shelf Life
In case of considering the shelf-life, how can I ran the optimizer with calculating Penalty costs for Continuing/Disposing Expired Products, I need a help of finding these details from the optimizer...
View ArticleAPO DP - Manage forecast for multiple items sharing same total forecast
Hello, I need your support to manage in APO DP the forecast calculation for different items sharingthe same total forecast. Example for a 3 month period M1 M2...
View ArticleContinue Using Expired Products/ Considering Shelf Life in Optimizer Run
Is there any Business scenario for this Expired Products/ why would any Business continue using Expired Products/ is there any scenario for this? Thank you
View Articledispose expired products/ Log not showing procurement cost only storage cost
When I run the Optimizer considering the Shelf Life and selecting the Dispose Expired Products in Optimizer Profile/ I'm not seeing the Procurement Cost only the Storage Cost ? Thank you
View ArticleRunning Optimization and the Storage Cost is changing for Stock On Hand
Today is 05/20/2016 I have a Demand on 06/05 Stock on 05/20/2016 is 50000, Forecast on 06/04 is 50000/ and we have another Forecast on 06/08 of 10 / Now when I run the Optimizer without Shelf Life/ My...
View Article/SAPAPO/POV1
Hi ExpertsNeed your suggestion for running /SAPAPO/POV1 in background in APO.From the selection screen I dont see any option to run in background.RegardsRoshan
View ArticleHow to enable Auto Complete option in SAP
Hello Guru, i want to enable my auto complete option in my system so as to get the past transaction or any codes quickly by pressing SPACEBAR, all other systems have this feature, they just by pressing...
View ArticleGRPT is considering calendar days not working days from factory calendar
Dear All, I searched in forum for the answer, but could not find, hence posting here. I have created a calendar resource of category handling unit with productive time of 24 hours. This resource has a...
View ArticlePlanning board Adjust and Reschedule Block Limits
Dear Experts I was running heuristics SAP_CDPBP_02 which is not getting execute successfully it showing Executed without result .What are the major settings I need to check . In settings of heuristic...
View ArticleShipment created in ECC when difference in quantity from EWM during PGI of TU
Hi, I've created an Outbound Delivery Order in EWM through STO from ECC which had a material of quantities 2, and 3 units each in Two HUs. I loaded these HUs to a TU and assigned the OBO to the TU and...
View ArticleSafety stocks setting in SNP
Hi All, I've set safety stocks of 5 days and monthly lot size in R/3. But SNP still doesn't prompt proposed production quantity at the right safety stock level.For example: SNP doesn't proposed to...
View ArticlePPDS Alert Monitoring: Container Resource
Gurus,I need to configure alerts when the order quantity exceeds container storage capacity. I have done the following: a. In the PPDS alert profile, I have checked the following alerts:...
View ArticleRunning Optimization and the Storage Cost is changing for Stock On Hand
Today is 05/20/2016 I have a Demand on 06/05 Stock on 05/20/2016 is 50000, Forecast on 06/04 is 50000/ and we have another Forecast on 06/08 of 10 / Now when I run the Optimizer without Shelf Life/ My...
View ArticleGATP most used t codes
hi men, I came across one superb doc. from satish wagmare, on GATP, he has cited A001 to A007 , SAPAPO/RBA04, SAPCND/A007 ,those are principal screens apart from this what t codes/screens have you...
View ArticleRelationship between Product Storage Definition, Resource Networks
Hello experts, I'm currently on the design phase of a project for implementing SAP APO PP/DS in a beverage company. Our biggest issue so far has been with finite tank planning. There are several...
View ArticlePlanned order avail/require date is same but having start date different in...
Hi All, Planned order created by SNP run (CTM) always has different start date and end date same in APO. The same planned order when we check in ECC its different but same in ECC. Example: Planned...
View Article