Process DP Background Processing, variant RROS XXXX has status Undefined...
Hello Experts, While running the background job in process chain, I got an error "Process DP Background Processing, variant XXXXX has status Undefined (instance )". Message Class - RSPC, Message Number...
View ArticleProduct heuristics planning dates
Dear All, I'm planning a subcontracted product interactively with product heuristics from RRP3.The planned delivery time in product master is 90 days & tranportattion time in lane is alos 90...
View ArticleSelection is locked by user XXX (Mesage /SAPAPO/SDP 221)
Hi, We are currently experiencing an error while loading data in planning selection is locked by user XXX ( Message / SAPAPO/SDP221). We have referred to note 1988958 and with help of that able to load...
View ArticleAuto populating in RES01
dear experts, I have in ECC work centre set up which is up and running 1.assigned to Master recippe with its operations and sub operations,phases 2. product assigned to work center I am calling this...
View ArticleHow to Change Planned Order Start Date & Time
Hi APO PPDS Experts, After PPDS Planning Run /SAPAPO/CDPBS0 Planned Order gets created on current date as Start Date (As per desired date). Please let me know how we can change Planned Order start date...
View ArticleQuestion on PDS to be used in inactive version in APO
HI All, How can we create PDS specific to a inactive version in APO Best Regardslss
View ArticleHow to move final forecast data for plant A to Plant B
Hi, The final forecast data is available on plant A due to wrong CVCs (Plant A with wrong Sales Org). Now I have to move that data to correct plant i.e. Plant B. Please let me know all possible...
View ArticleReceiving/shipping calender modeling
Hi all, I'm in a scenario where I cannot find a proper solution for.Imagine plant A and B are receiving from plant C. However, plant A cannot receive in the weekends, but plant B can.Available options...
View ArticleCFM2 Outbound Queue Error
Dear Experts, We are getting following error when we start activation of Integration model from transaction CFM2. Fm name: /SAPAPO/CIF_PROD_INBOUND Error text: Function parameter "CT_MATLPL_DEL" is...
View ArticleProduction orders from ECC not considering holidays in APO
Hi, Production orders created in ECC is respecting the holidays as per the factory calendar, but while updating the production order to APO it’s NOT considering the holidays. And the Order quantity...
View ArticleChange colors of orders displayed on planning board
Hi ExpertsI have a requirement that the users at my client dont like the colors of the orders displayed on the planning board. They want different colors for the planned orders. Currently I have purple...
View ArticleOrder Coloring on DS Planning Board
Hi Experts, Business: Manufacturing.Scope: Juice Manufacturing.Volume: 18 FlavorsSKU's: 62 individual SKU's based on packing/Overall about 18 Juice Groups. My client manufactures about 62 SKU's over 48...
View ArticleTracing CTM profile from CTM created order
Hi All, We run several CTM runs at out plant in succession for various purposes. I now have the planned order created by one of those CTM run. Will I be able to trace back the details of which CTM run...
View ArticleSales order not found in RRP3
We have a sales order for which ATP should be triggered in the APO system. The confirmed quantity against the sales order in ecc is zero,so the GATP is not taking place. when i check for the sales...
View ArticleMismatch in the Purchase order Delivery date in ECC and APO
Hi All, For some reason the purchase order delivery date in ECC and the End date of the Order in APO is not matching. The delivery date in ECC is 07.01.2016 whereas the order end date in APO in...
View Articlestart date in production order in ecc & APO
Hi All We convert planned order to production order in APO. I could see dinffrenec in start date in production order in ecc & APO Any specific reason??? ThanksSuren
View ArticleValues for fwd/bkwd consumption
Hi All, As part of my companies implementation of SAP we populated the forward and backwards consumption values to 20 and 20 for all items, for the sake of expediting the master data process. 6 months...
View ArticleList of material for which inspection stock element exists in RRP3
Hi All, I would like to extract the list of materials for which there exists a inspection stock element in RRP3.. Is there any standard table through which I can arrive at the above Best Regardslss
View ArticleSPP- DRP - Supersession - Predecessor net demand not rolled up to successor
HI In SPP - DRP, if a product is in supersession , the predecessor products' net demand is not getting rolled up to the successor product. If for example, Product A is being superseded by Product B, if...
View ArticleAPO Subcontracting Supplier
Hi,We want to use APO to do subcontracting but is this possible if we ship our final product from our subcontractor?We ship direct without using DC or anything else. We don't want the final product to...