Quantcast
Channel: SCN : All Content - SAP Advanced Planning & Optimization (SAP APO)
Viewing all articles
Browse latest Browse all 782

Master Data Check and CTM unable to read PPM for In-house production

$
0
0

Hi,

 

We are using SCM 7.0 EHP2 for CTM.

 

I am creating scenario for CTM run. As it is isolated APO system (not connected with ECC), I have created PPM directly in APO. While performing Master Data Check and CTM system is unable to read PPM for In-house production, kindly refer attached document for further details.

Following setting is already being checked:

1) CTM Global Custimisation is setup to read PPM

2) Plan Explosion field in Product-Location Master is setup to read PPM

3) Procurement Type is appropriately set for Inhouse Production.


We replicated same setup in SCM713 (connected to ECC), in that system Master Data Check and CTM were reading PPM for In-house production scenario. We compared tables in both system and found some PPM related tables (example: /sapapo/vplanppm) were available in SCM713 but not available in SCM7.0 EHP2. Not sure if extra tables were introduced in higher setup or those are because another system is integrated with ECC.


Kindly help to understand if I have missed any setup or any Note need to be implemented for using PPM in isolated system.


Thanks and regards,

Devang Shah


Viewing all articles
Browse latest Browse all 782

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>