Quantcast
Channel: SCN : All Content - SAP Advanced Planning & Optimization (SAP APO)
Viewing all articles
Browse latest Browse all 782

Subcontracting - no requirements in ECC for APO planned component product.

$
0
0

Hi all

 

We have a scenario where we produce a product in house. This is then sent to a subcontractor (along with packing materials) to pack into a multipack format.

(that is, the factory produces tins of peas for example. The external subcontractor then packages these tins up as three-packs.)

The multipack product and the component product are both planned in APO. The packing materials are ECC planned.

 

We do however have stock reporting that we drive out of ECC.

 

This all plans correctly in APO and we see the subcontract orders and their relevant demand on the component product and the resulting SNP planned orders to produce the component. All looks correct in APO.

 

In ECC we see the purchase requisition to procure the multipack product from the subcontractor, and the dependant requirements on the non-APO planned components. We also see the production of the component products. What we are missing from ECC is the dependant demand on the APO planned component product.

 

The purchase requisitions to procure the multipack produt show a bill of materials that doesn't include the component (although the BOM in ECC for the multipack product DOES include the APO planned component product).

 

Does anyone have any idea what we are missing here?

 

Thanks,

-Andy


Viewing all articles
Browse latest Browse all 782

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>