Dear all,
For experts on this topic probably an easy question.
In our scenario, the setup- groups/keys are configured in the PPDS PPM. Setup activity checkbox in the PPM is active.
Setup group maintainance is going to takes place for new articles. So the setup group or time is not derived from the ERP routing group.
Does SNP-buckets take this setup time in consideration? Or only the production consumption?
I want to be sure the SNP capacity is being affected (or not) by assigning the group to the PPM.
Many thanks for a helpful answer!